Chevrolet 1967CHEVY II Manuel d'installation Page 11

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 30
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 10
7.3.4 If you have a fiberglass body you should install a terminal black to ground all
your gauges and accessories. Ground the Terminal Block and everything will be
grounded.
Note: Grounding straps may be purchased from most auto supply stores.
8.0 HARNESS ATTACHMENT BY SECTION
8.1 FUSEBLOCK MOUNTING
8.1.1 Take the grommet provided and install into the hole in the adapter plate. Route
the ENGINE and HEADLIGHT SECTIONS through the adaptor plate hole and
firewall while bolting the fuseblock to the adapter plate, allowing the assembly to
hang free.
8.1.2 Route the DASH SECTION (ignition, instrument panel, headlight switch,
etc)around the kick panel, over the steering column and the along the bottom
the dash.
8.1.3 Position the fuseblock assembly so that the grommet is centered in the bulkhead
hole. Using the 2 screws provided attach the fuseblock adapter plate to the
firewall. See FIGURE 8.2 & 8.3
NOTE: The fuseblock itself does not have to be grounded.
6
Figure 8.1 Pre-Routing Engine and Headlight Sections
Figure 8.2 Screws Securing Adapter Bracket
Vue de la page 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 29 30

Commentaires sur ces manuels

Pas de commentaire